BAM Ritchies

Geotechnical

Ground anchors; straight shafted, pressure grouted and multi-stage with installed capacities up to 11,150 kN.

Soil nails; full design and construct capability both temporary and permanent works.

Mini-piles; installed diameters generally in the range of 150 mm - 900 mm. Fast efficient pile installations with advanced drilling systems in difficult ground.

Slope Stabilisation; active slope support using high tensile meshes and rock fall netting installations using IRATA certificated operatives and installation of rock fall barriers meeting European and Swiss guidelines.

Grouting; controlled high quality grouting for tunnel and breakwater repairs. Bulk grouting of shallow abandoned coal workings. Grouting for ground stabilisation and water cut-off.

Tunnel Repairs; bolting, lining repairs, drainage, reinforcement, meshing